EBS Global · LGS Pre-fab

Build Faster. Build Smarter. Build Canada.

EBS Global LGS Pre-fab — factory-engineered steel frames for every Canadian province.

Explore LGS Systems

Scroll to build

EBS GLOBAL · LGS FRAME
Members installed 000/111
Assembly time 0s (real: ~6 weeks)
Schedule saved 0 days

±1.5mm tolerance

Step 0 / 8 · keep scrolling

Live Construction Race

Time Saved: +0 months

Traditional BuildMonth 0/12
Site prepFoundation cure ❄Wood framing ☔SheathingRough mechanicalsDrywallInsulationFinishing
👷👷👷👷👷👷👷👷👷👷

High labor · weather-dependent

Modura LGS BuildMonth 0/6
Foundation + factory ⚙LGS frame deliveryFrame assembly (1–2 days)Panels installedEnvelope closedMechanicals (interior)FinishingREADY FOR OCCUPANCY ✓
👷👷👷👷

Less on-site labor · weather-independent

Traditional cost

$824,000

Modura LGS cost

$612,000

You save

$0

Material waste

15% vs 85%

Performance Dashboard

Mission-critical numbers.

Faster Project Delivery

0

Less On-Site Labor

0

Factory Tolerance

±1.5mm

Cladding Warranty

0

Toronto, ON

avg LGS build · 10–14 months

$299/sq ft

Vancouver, BC

avg LGS build · 11–15 months

$318/sq ft

Calgary, AB

avg LGS build · 9–13 months

$282/sq ft

Build Your Home

Know your numbers before you break ground.

From laneway suites to detached homes and multi-unit projects — get a province-aware, LGS-specific cost estimate in seconds. Built for Canadian builders, developers, and homeowners who want real numbers, not guesswork.

Detached Homes

2,000 – 6,000 sq ft custom builds

Laneway & Garden Suites

Compact units with full-service pricing

Multi-Unit & Duplex

Scalable LGS estimates per door

Tiny & Modular Homes

Factory-ready panel packages

Estimate any Canadian home type in under 60 seconds.

Select your building type, province, square footage, and finish level. See hard cost, timeline, and LGS vs. wood-frame comparison instantly.

Get Your Free Estimate

No email required · Instant results · Province-specific pricing

Product Ecosystem

Every component, engineered together.

Build Phases

From foundation to occupancy — engineered timing.

Scroll to walk through each phase of an EBS Global LGS build.

Start your build →

Build Phase

EBS Global · LGS Frame
Phase 1/5 — Foundation
Concrete slab + anchor bolts±1.5mm positioning accuracy

Proof of Build

Completed across Canada.

Residential LGS Home in Toronto, ON
ON

Residential LGS Home

Toronto, ON

2,400 sq ft11 months$299/sq ft
Laneway House in Vancouver, BC
BC

Laneway House

Vancouver, BC

800 sq ft6 months$318/sq ft
Duplex in Calgary, AB
AB

Duplex

Calgary, AB

3,200 sq ft13 months$282/sq ft
Tiny Home in Halifax, NS
NS

Tiny Home

Halifax, NS

480 sq ft5 months$265/sq ft

30+ Years Canadian Construction

500+ LGS Projects

CSA Certified

All 10 Provinces

The Future of Construction Is Already Here.

Build faster, reduce costs, and deliver your Canadian project with confidence — powered by EBS Global LGS systems.

Talk to an Engineer

Trusted by 500+ Canadian builders · 10,000+ estimates generated · All 10 provinces